title

Archive

 

MaliVai Foundation Teen Center

02 Jun 2020, Posted by Laura Gersbeck in

MaliVai Foundation Teen Center This project consisted of a new approximately 10,000 SF two-story Teen Center building and the renovation of...

Fleming Island YMCA

02 Jun 2020, Posted by Laura Gersbeck in

Fleming Island YMCA The project consisted of the design of a new 32,000 SF YMCA building, an exterior pool (to be...

Daytona Lagoon

02 Jun 2020, Posted by Laura Gersbeck in

Daytona Lagoon This project consisted of adding and creating pools, pedestrian bridges and various park-like structures. Some buildings are over water....

Baptist North YMCA

02 Jun 2020, Posted by Laura Gersbeck in

Baptist North YMCA The project consisted of a 40,000 SF, two-story medical office building and an 18,000 SF YMCA facility....

Water Parks

02 Jun 2020, Posted by Laura Gersbeck in

Water Parks These projects consisted of pools, pedestrian bridges          and various park-like structures for several different water/amusement...

Hyatt House

02 Jun 2020, Posted by Wayne Mangum in

Hyatt House The project consisted of renovations to approximately fifty-five 2-bedroom units and renovations to the existing lobby, restrooms and dining...

Home 2 Suites Charlotte

02 Jun 2020, Posted by Wayne Mangum in

Home 2 Suites Charlotte The project consisted of a new seven story, 156 key hotel with full amenities on the first...

Focal Point Church

02 Jun 2020, Posted by Laura Gersbeck in

Focal Point Church The project consisted of a 10,000 SF single-story church using tilt-up concrete panel construction.  It included a sanctuary...

First Baptist Church Downtown

02 Jun 2020, Posted by Laura Gersbeck in

First Baptist Church Downtown This project consisted of a 100,000 SF four-story classroom and multi-purpose facility, including Children’s Building and Welcome...

First Baptist Church Mandarin

02 Jun 2020, Posted by Laura Gersbeck in

First Baptist Church Mandarin This project consisted of an 43,000 SF single-story church using tilt-up concrete panel construction.  It included a...

Crossroad Church UMC

02 Jun 2020, Posted by Laura Gersbeck in

Crossroad Church UMC The project consisted of a 100,000 SF church auditorium and office and classroom building....

Christ’s Church Mandarin

02 Jun 2020, Posted by Laura Gersbeck in

Christ's Church Mandarin The project consisted of a two-story 78,500 SF church with a 2,500-seat auditorium, atrium, offices and Children's Educational...

Chabad Center for Jewish Life

02 Jun 2020, Posted by Laura Gersbeck in

Chabad Center for Jewish Life This project was a new 18,672 SF sanctuary. It included a sanctuary, kitchen, conference room, classrooms...

Seven Rivers Presbyterian Church

02 Jun 2020, Posted by Laura Gersbeck in

Seven Rivers Presbyterian Church The project consisted of a 39,000 SF worship facility comprised of a sanctuary, lobby, classrooms and offices....

12 Stone Sugarloaf

02 Jun 2020, Posted by Laura Gersbeck in

12 Stone Sugarloaf The project consisted of a single building with two wings comprising the John Maxwell Leadership Center (JMC) and...

Woodfield Gateway

02 Jun 2020, Posted by Laura Gersbeck in

Woodfield Gateway The project consisted of the new design of an apartment with five stories of wood framing in a stepped...

The Irby

02 Jun 2020, Posted by Laura Gersbeck in

The Irby The project consisted of a twelve story mixed use facility of approximately 450,000 SF. The building consists of eight...